You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
155 lines
3.9 KiB
155 lines
3.9 KiB
// Copyright 2019 Google Inc. All rights reserved.
|
|
//
|
|
// Licensed under the Apache License, Version 2.0 (the "License");
|
|
// you may not use this file except in compliance with the License.
|
|
// You may obtain a copy of the License at
|
|
//
|
|
// http://www.apache.org/licenses/LICENSE-2.0
|
|
//
|
|
// Unless required by applicable law or agreed to in writing, software
|
|
// distributed under the License is distributed on an "AS IS" BASIS,
|
|
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
|
// See the License for the specific language governing permissions and
|
|
// limitations under the License.
|
|
|
|
package status
|
|
|
|
import (
|
|
"time"
|
|
|
|
"android/soong/ui/logger"
|
|
)
|
|
|
|
func NewCriticalPath(log logger.Logger) StatusOutput {
|
|
return &criticalPath{
|
|
log: log,
|
|
running: make(map[*Action]time.Time),
|
|
nodes: make(map[string]*node),
|
|
clock: osClock{},
|
|
}
|
|
}
|
|
|
|
type criticalPath struct {
|
|
log logger.Logger
|
|
|
|
nodes map[string]*node
|
|
running map[*Action]time.Time
|
|
|
|
start, end time.Time
|
|
|
|
clock clock
|
|
}
|
|
|
|
type clock interface {
|
|
Now() time.Time
|
|
}
|
|
|
|
type osClock struct{}
|
|
|
|
func (osClock) Now() time.Time { return time.Now() }
|
|
|
|
// A critical path node stores the critical path (the minimum time to build the node and all of its dependencies given
|
|
// perfect parallelism) for an node.
|
|
type node struct {
|
|
action *Action
|
|
cumulativeDuration time.Duration
|
|
duration time.Duration
|
|
input *node
|
|
}
|
|
|
|
func (cp *criticalPath) StartAction(action *Action, counts Counts) {
|
|
start := cp.clock.Now()
|
|
if cp.start.IsZero() {
|
|
cp.start = start
|
|
}
|
|
cp.running[action] = start
|
|
}
|
|
|
|
func (cp *criticalPath) FinishAction(result ActionResult, counts Counts) {
|
|
if start, ok := cp.running[result.Action]; ok {
|
|
delete(cp.running, result.Action)
|
|
|
|
// Determine the input to this edge with the longest cumulative duration
|
|
var criticalPathInput *node
|
|
for _, input := range result.Action.Inputs {
|
|
if x := cp.nodes[input]; x != nil {
|
|
if criticalPathInput == nil || x.cumulativeDuration > criticalPathInput.cumulativeDuration {
|
|
criticalPathInput = x
|
|
}
|
|
}
|
|
}
|
|
|
|
end := cp.clock.Now()
|
|
duration := end.Sub(start)
|
|
|
|
cumulativeDuration := duration
|
|
if criticalPathInput != nil {
|
|
cumulativeDuration += criticalPathInput.cumulativeDuration
|
|
}
|
|
|
|
node := &node{
|
|
action: result.Action,
|
|
cumulativeDuration: cumulativeDuration,
|
|
duration: duration,
|
|
input: criticalPathInput,
|
|
}
|
|
|
|
for _, output := range result.Action.Outputs {
|
|
cp.nodes[output] = node
|
|
}
|
|
|
|
cp.end = end
|
|
}
|
|
}
|
|
|
|
func (cp *criticalPath) Flush() {
|
|
criticalPath := cp.criticalPath()
|
|
|
|
if len(criticalPath) > 0 {
|
|
// Log the critical path to the verbose log
|
|
criticalTime := criticalPath[0].cumulativeDuration.Round(time.Second)
|
|
cp.log.Verbosef("critical path took %s", criticalTime.String())
|
|
if !cp.start.IsZero() {
|
|
elapsedTime := cp.end.Sub(cp.start).Round(time.Second)
|
|
cp.log.Verbosef("elapsed time %s", elapsedTime.String())
|
|
if elapsedTime > 0 {
|
|
cp.log.Verbosef("perfect parallelism ratio %d%%",
|
|
int(float64(criticalTime)/float64(elapsedTime)*100))
|
|
}
|
|
}
|
|
cp.log.Verbose("critical path:")
|
|
for i := len(criticalPath) - 1; i >= 0; i-- {
|
|
duration := criticalPath[i].duration
|
|
duration = duration.Round(time.Second)
|
|
seconds := int(duration.Seconds())
|
|
cp.log.Verbosef(" %2d:%02d %s",
|
|
seconds/60, seconds%60, criticalPath[i].action.Description)
|
|
}
|
|
}
|
|
}
|
|
|
|
func (cp *criticalPath) Message(level MsgLevel, msg string) {}
|
|
|
|
func (cp *criticalPath) Write(p []byte) (n int, err error) { return len(p), nil }
|
|
|
|
func (cp *criticalPath) criticalPath() []*node {
|
|
var max *node
|
|
|
|
// Find the node with the longest critical path
|
|
for _, node := range cp.nodes {
|
|
if max == nil || node.cumulativeDuration > max.cumulativeDuration {
|
|
max = node
|
|
}
|
|
}
|
|
|
|
// Follow the critical path back to the leaf node
|
|
var criticalPath []*node
|
|
node := max
|
|
for node != nil {
|
|
criticalPath = append(criticalPath, node)
|
|
node = node.input
|
|
}
|
|
|
|
return criticalPath
|
|
}
|