You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
167 lines
3.9 KiB
167 lines
3.9 KiB
// Copyright 2019 Google Inc. All rights reserved.
|
|
//
|
|
// Licensed under the Apache License, Version 2.0 (the "License");
|
|
// you may not use this file except in compliance with the License.
|
|
// You may obtain a copy of the License at
|
|
//
|
|
// http://www.apache.org/licenses/LICENSE-2.0
|
|
//
|
|
// Unless required by applicable law or agreed to in writing, software
|
|
// distributed under the License is distributed on an "AS IS" BASIS,
|
|
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
|
// See the License for the specific language governing permissions and
|
|
// limitations under the License.
|
|
|
|
package status
|
|
|
|
import (
|
|
"reflect"
|
|
"testing"
|
|
"time"
|
|
)
|
|
|
|
type testCriticalPath struct {
|
|
*criticalPath
|
|
Counts
|
|
|
|
actions map[int]*Action
|
|
}
|
|
|
|
type testClock time.Time
|
|
|
|
func (t testClock) Now() time.Time { return time.Time(t) }
|
|
|
|
func (t *testCriticalPath) start(id int, startTime time.Duration, outputs, inputs []string) {
|
|
t.clock = testClock(time.Unix(0, 0).Add(startTime))
|
|
action := &Action{
|
|
Description: outputs[0],
|
|
Outputs: outputs,
|
|
Inputs: inputs,
|
|
}
|
|
|
|
t.actions[id] = action
|
|
t.StartAction(action, t.Counts)
|
|
}
|
|
|
|
func (t *testCriticalPath) finish(id int, endTime time.Duration) {
|
|
t.clock = testClock(time.Unix(0, 0).Add(endTime))
|
|
t.FinishAction(ActionResult{
|
|
Action: t.actions[id],
|
|
}, t.Counts)
|
|
}
|
|
|
|
func TestCriticalPath(t *testing.T) {
|
|
tests := []struct {
|
|
name string
|
|
msgs func(*testCriticalPath)
|
|
want []string
|
|
wantTime time.Duration
|
|
}{
|
|
{
|
|
name: "empty",
|
|
msgs: func(cp *testCriticalPath) {},
|
|
},
|
|
{
|
|
name: "duplicate",
|
|
msgs: func(cp *testCriticalPath) {
|
|
cp.start(0, 0, []string{"a"}, nil)
|
|
cp.start(1, 0, []string{"a"}, nil)
|
|
cp.finish(0, 1000)
|
|
cp.finish(0, 2000)
|
|
},
|
|
want: []string{"a"},
|
|
wantTime: 1000,
|
|
},
|
|
{
|
|
name: "linear",
|
|
// a
|
|
// |
|
|
// b
|
|
// |
|
|
// c
|
|
msgs: func(cp *testCriticalPath) {
|
|
cp.start(0, 0, []string{"a"}, nil)
|
|
cp.finish(0, 1000)
|
|
cp.start(1, 1000, []string{"b"}, []string{"a"})
|
|
cp.finish(1, 2000)
|
|
cp.start(2, 3000, []string{"c"}, []string{"b"})
|
|
cp.finish(2, 4000)
|
|
},
|
|
want: []string{"c", "b", "a"},
|
|
wantTime: 3000,
|
|
},
|
|
{
|
|
name: "diamond",
|
|
// a
|
|
// |\
|
|
// b c
|
|
// |/
|
|
// d
|
|
msgs: func(cp *testCriticalPath) {
|
|
cp.start(0, 0, []string{"a"}, nil)
|
|
cp.finish(0, 1000)
|
|
cp.start(1, 1000, []string{"b"}, []string{"a"})
|
|
cp.start(2, 1000, []string{"c"}, []string{"a"})
|
|
cp.finish(1, 2000)
|
|
cp.finish(2, 3000)
|
|
cp.start(3, 3000, []string{"d"}, []string{"b", "c"})
|
|
cp.finish(3, 4000)
|
|
},
|
|
want: []string{"d", "c", "a"},
|
|
wantTime: 4000,
|
|
},
|
|
{
|
|
name: "multiple",
|
|
// a d
|
|
// | |
|
|
// b e
|
|
// |
|
|
// c
|
|
msgs: func(cp *testCriticalPath) {
|
|
cp.start(0, 0, []string{"a"}, nil)
|
|
cp.start(3, 0, []string{"d"}, nil)
|
|
cp.finish(0, 1000)
|
|
cp.finish(3, 1000)
|
|
cp.start(1, 1000, []string{"b"}, []string{"a"})
|
|
cp.start(4, 1000, []string{"e"}, []string{"d"})
|
|
cp.finish(1, 2000)
|
|
cp.start(2, 2000, []string{"c"}, []string{"b"})
|
|
cp.finish(2, 3000)
|
|
cp.finish(4, 4000)
|
|
|
|
},
|
|
want: []string{"e", "d"},
|
|
wantTime: 4000,
|
|
},
|
|
}
|
|
for _, tt := range tests {
|
|
t.Run(tt.name, func(t *testing.T) {
|
|
cp := &testCriticalPath{
|
|
criticalPath: NewCriticalPath(nil).(*criticalPath),
|
|
actions: make(map[int]*Action),
|
|
}
|
|
|
|
tt.msgs(cp)
|
|
|
|
criticalPath := cp.criticalPath.criticalPath()
|
|
|
|
var descs []string
|
|
for _, x := range criticalPath {
|
|
descs = append(descs, x.action.Description)
|
|
}
|
|
|
|
if !reflect.DeepEqual(descs, tt.want) {
|
|
t.Errorf("criticalPath.criticalPath() = %v, want %v", descs, tt.want)
|
|
}
|
|
|
|
var gotTime time.Duration
|
|
if len(criticalPath) > 0 {
|
|
gotTime = criticalPath[0].cumulativeDuration
|
|
}
|
|
if gotTime != tt.wantTime {
|
|
t.Errorf("cumulativeDuration[0].cumulativeDuration = %v, want %v", gotTime, tt.wantTime)
|
|
}
|
|
})
|
|
}
|
|
}
|